After the project starts, we will arrange for our engineers to the site as soon as possible. No matter from the supervision of the tank making, the installation and placement of the equipment, to the debugging and training of the equipment or the production line, our engineers will always be with the customer until the equipment or the production line runs steadily.


Install Instructions


  • The equipment will be transported to the site by an overland truck. Under the guidance of our technical engineer, the general contractor or the installation unit will arrange unloading and protection of the equipment on site.  After the completion of the unloading of the equipment, our company engineer will accompany the general contractor or installation unit and other departments to carry out the equipment for inventory and inspection.


  • Cooperate with the general contractor or installation company to develop a safe and reliable equipment access road map according to the actual situation on site;  Investigate the size of the equipment transportation channel and the equipment hoisting port, and determine the specific approach of each equipment and system (complete machine and separate parts).


  • Carry out technical clarification and disclosure before equipment installation.  Our company's technical engineer will clarify the equipment operation manual, equipment installation plan, and equipment installation drawings, to ensure that the installation engineer can be the safe and reliable installation of the equipment.  In addition, according to the results of field condition detection, analysis of the site conditions to meet the equipment installation conditions, whether the equipment can be installed, etc.  If the site technical disclosure is successful and the site conditions meet the equipment installation conditions, determine the equipment installment plan.


  • According to the equipment installation plan, the general contractor or the installation company is responsible for the on-site hoisting of the equipment, and our technical engineer will provide on-site technical guidance.  After the completion of equipment installation, our technical engineer will check the quality of equipment installation and carry out strict and serious quality inspections on all on-site equipment to ensure the correct installation of equipment.


  • Debugging and preliminary acceptance: after the installation of each piece of equipment, a single test run shall be carried out, including mechanical and electrical debugging of the equipment. We will assign special persons to cooperate with and guide the general contractor to carry out this work. Through the single test run, test and adjust the running state of the equipment, to ensure that the parameters of the running state of the equipment meet the design requirements. After the equipment is qualified for a test run and debugging, the preliminary acceptance procedures shall be carried out according to the arrangement. Hongvadar company will provide the debugging report of the equipment in time as the basis of the preliminary acceptance.


  • The project manager keeps track of the equipment throughout the installation process. The project manager is responsible for the scheduling and arrangement of on-site technicians, coordinate and cooperate with the installation unit, equipment installation progress, technical and quality issues, and contact with customers for the coordination.  Responsible for the progress, technology and quality of equipment installation and commissioning, find and solve the problems in time, and assist in the acceptance of equipment.